| 18. | Inspecting and testing of Supply Authority lines and apparatus before connecting to a system |
| 19. | Notice of intention to erect |
| 20. | Materials to be used for line conductors |
| 21. | Line conductors shall be inaccessible |
| 22. | Connection of service lines |
| 23. | Minimum height of conductor |
| 24. | Supports for line conductors |
| 25. | Tension of conductors |
| 26. | Erection of line conductors at different voltages on same support |
| 27. | Standard of construction of high voltage transmission lines |
| 28. | Supply Authority may transform and control energy at high voltage |
| 29. | Outdoor sub-stations |
| 30. | Means to render high voltage lines dead due to breakage |
| 31. | Switching and fusing of sub-stations |
| 32. | Earthing |
| 33. | Protection against excess energy |
| 34. | Protection of consumers' installations against excess energy |
| 35. | Safety precautions |
| 36. | Accidents to be reported by Supply Authority to Chief Electrical Inspector |
| 37. | Power to inspect and test Supply Authority works |