18. | Inspecting and testing of Supply Authority lines and apparatus before connecting to a system |
19. | Notice of intention to erect |
20. | Materials to be used for line conductors |
21. | Line conductors shall be inaccessible |
22. | Connection of service lines |
23. | Minimum height of conductor |
24. | Supports for line conductors |
25. | Tension of conductors |
26. | Erection of line conductors at different voltages on same support |
27. | Standard of construction of high voltage transmission lines |
28. | Supply Authority may transform and control energy at high voltage |
29. | Outdoor sub-stations |
30. | Means to render high voltage lines dead due to breakage |
31. | Switching and fusing of sub-stations |
32. | Earthing |
33. | Protection against excess energy |
34. | Protection of consumers' installations against excess energy |
35. | Safety precautions |
36. | Accidents to be reported by Supply Authority to Chief Electrical Inspector |
37. | Power to inspect and test Supply Authority works |